Call Us: +44 (0) 161 626 9628 | Email Us: info@ePowerTrucks.co.uk

Alke ATX 340 EH Supplied To Suffolk Hospital For Waste Management.

Project Description

ALKE ATX340EH (4500kg towing capacity) with a custom built trailer supplied to a hospital in Suffolk yesterday. This trailer has been designed with a low deck height to aid easy loading of 1100 litre bins. This solution replaces an expensive diesel powered 7.5 tonne lorry with tail lift.

#hospitals #alke #electric #waste #trailer #solutions

Project Details

  • Date February 21, 2019
  • Tags Alke, Electric Vehicle News, Hospital Equipment, Utility Vehicle
Back to Top